top of page
Facca Incorporated Logo

BRIDGING THE GAP SINCE 1955

Touchette Bridge Rehab

OWNER:
SCOPE:
MODEL:
BUDGET:
YEAR :

Municipality of The Nation (La Nation)

Heavy Civil - Steel Truss Bridge Rehabilitation & Deck Replacement

Design-Bid-Build (DBB)

4.5 Million

2023

Project involved a full rehabilitation and widening of the existing structure. This included the removal of the old structure.

Phone
Fax

Email

Address

(519) 975-0377

(519) 975-0427

© 2035 by Facca Incorporated. Powered and secured by Wix

2097 COUNTY RD 31

RUSCOM STATION, ON N0R 1R0

CANADA

  • Facebook
  • LinkedIn
bottom of page